IATF16949 {8.5.1.4} Verification after shutdown - Explained

IATF16949 {8.5.1.4} Verification after shutdown

The organization shall define and implement the necessary actions to ensure product compliance with
requirements after a planned or unplanned production shutdown period

EXPLAINATION -

PROCEDURE FOR VERIFICATION AFTER MAJOR SHUTDOWN

If any planned or unplanned shutdown is more than 30 Days then verify the production facility.

 Ensure that the production process outputs are complying with the necessary product requirements as per the control plan or process plan as necessary and as applicable depend on shut down time and nature of shutdown 

by following ways,
1. Job Set up Approval Report
2. By checking plant facility and layout condition
3. By revalidating the processes.
4. By doing manufacturing process audit
5. By doing product audit
6. By submitting sample lot to customer for verification 
7. By taking functional feedback from customer for sample lot.
8. By doing Machine fitness test if any.  



Take necessary approvals from concern customers like resubmission of samples, PPAP report, SPC report or any audit from customer as per the customer specific requirements etc. after the shutdown is over.

Comments

Popular posts from this blog

IATF16949(ISO9001) {8.5.6} Control of changes - Explained

IATF16949 {6.1.2.3} Contingency Plans - Explained

IATF16949 {8.5.1.1} Control Plan - Explained