Posts

Showing posts with the label First Piece Inspection

IATF16949 {8.5.1.3} Verification of job set-ups - Explained

IATF16949 {8.5.1.3} Verification of job set-ups The organization shall: a) verify job set-ups when performed, such as an initial run of a job, material change over or job change that requires a new set-up; b) maintain documented information for set-up personnel; c) use statistical methods of verification, where applicable; d) perform first-off/last-off part validation, as applicable; where appropriate, first-off parts should be retained for comparison with the last-off parts; where appropriate, last-off-parts should be retained for comparison with first-off parts in subsequent runs; e) retain records of process and product approval following set-up and first off/last-off part validations. EXPLAINATION-  PROCEDURE FOR JOB SET UP APPROVAL Ensure that the setting layout are accessible and understood by the concerned operators.    Carry out component setting as per Operational Control Procedure.   Carry out Job set up verification on the following occasions: a.  Ini...