Posts

Showing posts with the label Verification After Shutdown

IATF16949 {8.5.1.4} Verification after shutdown - Explained

IATF16949 {8.5.1.4} Verification after shutdown The organization shall define and implement the necessary actions to ensure product compliance with requirements after a planned or unplanned production shutdown period EXPLAINATION - PROCEDURE FOR VERIFICATION AFTER MAJOR SHUTDOWN If any planned or unplanned shutdown is more than 30 Days then verify the production facility.  Ensure that the production process outputs are complying with the necessary product requirements as per the control plan or process plan as necessary and as applicable depend on shut down time and nature of shutdown  by   following ways, 1. Job Set up Approval Report 2. By checking plant facility and layout condition 3. By revalidating the processes. 4. By doing manufacturing process audit 5. By doing product audit 6. By submitting sample lot to customer for verification  7. By taking functional feedback from customer for sample lot. 8. By doing Machine fitness test if any.   Take necess...